
New TopShim run:

version = topshim 2.0.0
date = 2022-10-11
time = 10:22:00.490
command = topshim 

FINE SHIMMING

Parameters:

probe = Z108618_0624
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.4 Hz, Target= 0.4 Hz, After= 0.4 Hz
Iteration  2: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.49

shim changes: 
Z	-4
Z2	+3
Z3	-69
Z4	+390
Z5	+220

duration = 2 min 13 sec
completed successfully
finished Tue Oct 11 10:24:12 2022


========================================================================
